Home
Home
Company
Educational resources
Engineering details
The Precast Product
Project Gallery
Contact Us

Recent Projects

Farwell Road Lowering
(16) Tub Girders varying in height from 4'-6" to 5'-6" for a portion of the new North South Freeway in Spokane,Washington.

Bridge Systems

Bridges developed by Central Pre-Mix Prestress offer a lower cost alternative to other bridge systems. The bridges are fast and easy to engineer and have received wide acceptance within the marketplace. Traffic interruption is minimal through rapid construction time, using precast prestressed bridge components. Find out more about the detailed specifications of each product within our Bridge Systems line.